2019-02-25 Meeting notes

2019-02-25 Meeting notes

Date

Attendees

Goals

  • Review tasks and plan next weeks tasks

Discussion items

ItemWhoNotes
Outstanding tasks
  • No new updates to the Extract Specification until the fields that Rapolas has identified as not having a database field to extract from are resolved. George Swinnerton will send the list to James Medcalf for his input.and advice.
  • Simplified have still not responded about the extract George provided.
  • The Extract for Lizzie at leads has been done.
  • The mismerged patient has been removed from RaDaR
  • George Swinnerton has sent the 3C extract to Richard Haynes who has found it has a lack of data in some of the required fields due to those items only recently being added. George Swinnerton has suggested more data may available for some patients on Patientview. He has asked Katharine if this data can be used or if another DSA is required etc.
  • The thinkidneys issue has been resolved and was caused by re-directions in WP between www.thinkkidneys.nhs.uk and thinkkidneys.nhs.uk.
  • The RAG report has been updated except for an outstanding query with Retha concerning one of the ranges which is not listed in the information she supplied. Rapolas is awaiting confirmation it is as he expects..
  • Renalware have not been in touch. George Swinnerton has heard Tim is on holiday and will be able to progress things in a week or so.
  • Liverpool feeds The only issues George Swinnerton has been asked to investigate have been patients with the pid issue so will be resolved once live is migrated.
  • Relocation NBT have provided quotes for two types of connection to the new office:
    1. A straight Ethernet Extension link
    2. An IPVPN which is the more modern link type that NBT have started using.
  • Validation George Swinnerton has released a new version with all the fixes rolled up in it that were in review (v1.1.8) This included a new fix for a crashing Leicester file where there was a missing AKI block start date.
  • rapolas (Unlicensed) had no RaDaR updates to provide.
Penetration testing

N3 Penetration testing has not been completed. They apparently decided to stop but didn't tell us when we flagged the potential risk in the indicators site of clicking the wrong button and sending emails to all units. It has been decided we will put up a demo version to allow them to test the indicators site without risk of issues. rapolas (Unlicensed) wil put this up on the UKRR Demo server demo.renalreg.org.

Sec test will carry out the internet test from the 8th March. Inorder to do this they will need some test logins on the servers requiring manual testing. rapolas (Unlicensed) will create the International Radar ones and transplant first ones. George Swinnerton will create ones for Patientview live and test. Tim Whitlock (Deactivated) will get ones sorted for renal.org.

Domain TransfersTim Whitlock (Deactivated)We are currently trying to transfer the Patientview domains to 123reg under the registry. We have the necessary Transfer codes but don't have any information on the email routing/redirections for patientview. Without these we may break the email service with the trnasfer. We can still do the renalpatientview.org transfer as this just has some ip addresses configured. This can be done as soon as the payments can be made. Once the domain is transferred we will need to configure the ips.

Action items

  • George Swinnerton to send list of fields that have no obvious extract filed to James for His comments and advice  
  • All to sort test accounts for the penetration testing on the internet servers  
  •