2019-09-23 Meeting notes

2019-09-23 Meeting notes

Date

Attendees

Goals

  • Review progress plan week ahead

Discussion items

ItemWhoNotes
Outstanding Items
  • George Swinnerton has looked through Rapolas' deletion code and checked it makes sense. He needs to check with Nick if there is anything else that needs to be considered/has changed.
  • George Swinnerton has run the EQUAL matching however they are still not happy with the data so are going back to some more sites for extra information.
  • Andrew Atterton has been working on  
    Error rendering macro 'jira' : Unable to locate Jira server for this macro. It may be due to Application Link configuration.
     None of the other outstanding tickets have been started yet in the June 2019 sprint.  George Swinnerton has found there is an issue with the building of one of the packages which was changed to work like the rest but now doesn't find the requirements.txt file correctly. He will resolve this.
  • George Swinnerton has found why the issue arose with the file not importing and logging correctly. It was due to a column existing as a str but having a number stored . As to why the loading didn't record in the log table there is no answer but it could have been caused by a crash that wasn't noticed. 
  • UKRR extract. Hugh is on holiday this  week however Tim has resolved most of the issues so the number of errors are manageable by the Data managers. This means we are in a position to  copy a fresh copy of the live database to staging and populate it with an overnight feed from which the quarterly files can be generated with out any historic artifacts form the many test versions previously sent. This should allow the Kings file to be processed for 2018.
    There are still a couple of strange extract errors which may be due to the data caching not working correctly. George Swinnertonwill restart the appserver to see if this will resolve the issue in the short term. meanwhile we need to look at an improved caching mechanism to prevent this.
  • Relocation the "final" files have been sent to the surveyor and we await his sign off which should trigger a contract to sign.
  • Most of the in review tickets have been signed off with a few outstanding issues to be sorted. 
 RaDaR Tim Whitlock (Deactivated) Fiona has a list of tickets she would like done which James will start looking at as soon as he has completed the UI search feature. 

Action items

  • George Swinnertonrestart appserver on staging to resolve UKRR-extract issue  
  • George Swinnerton to copy live database to staging so audit files can be generated for Fran  
  •  George Swinnerton to apply fix to renalreg database to resolve file load anomaly  
  • james.griffin (Unlicensed) to start looking at the RaDaR tickets Fiona has prioritised as soon as UKRDC UI changes are working