Outstanding TasksTim Whitlock (Deactivated)
  • George Swinnerton has not configured the transfer of the extra data for the simplified project. The code is now running on systems-live. This will be sorted this week.
  • George Swinnerton has heard from Kings they have resent all data (  ) for patients (start date January) This had not been loaded initially due to an issue with the sftp download to mirth which was not looking in the correct folder.
  • George Swinnerton as far as can be seen there are no improvements to the data content though they do seem to be including weights and BPs. George Swinnerton will follow this up.
  • SSG are working on fixing some issues highlighted by the pentest and saying some don't need fixing.
  • rapolas (Unlicensed) has fixed one issue from pentesting and is working on the other issue raised.
  • George Swinnerton has not progressed the change log and versioning for the XML schemas.
  • George Swinnerton has verified that the correct field is used for the last login report generated for Leeds. Shaun has found anomalies in the way SSG display the data for a month as it appears they miss report the end of the month.
  • George Swinnerton has heard back from Nick about study groups and he has suggested just trying it as it should work.
  • The NHSBT file has been re-ru at their request as they used two digit dates instead of 4 for year fields to ensure matching was complete. Shaun also wants to add some extra paeds data.
  • Atlassian confluence installs have been updated due to a security advisory
  • Relocation contract progress is slow.   